Bare Land — Due Diligence Guide for NZ Buyers

Bare land (vacant land) is a property with no buildings. It's purchased for future development, whether that's building a home, subdividing, or holding as an investment. Title is usually freehold.

How Bare Land Differs

AttributeBare LandOther Types
BuildingsNoneEstablished house: Existing dwelling
FinanceTypically higher deposit required (often 50%)Standard: 10-20% deposit
Development costsFull build cost aheadMove-in ready
Due diligence focusGeotechnical, services, consent riskBuilding condition, consents

Key Risks & Red Flags

Bare land has specific development-related risks:

  • Geotechnical issues: Ground conditions may require expensive foundations.
  • Services: Water, wastewater, power, and internet connections may be costly or unavailable.
  • Consent risk: Building or resource consent may not be straightforward.
  • Development costs: Easy to underestimate the total cost of building.
  • Covenants: New subdivisions often have restrictive covenants on building design.
  • Holding costs: Rates, interest, and insurance while the land sits undeveloped.

Due Diligence Checklist

  • Commission a geotechnical report (essential before designing foundations)
  • Confirm availability and cost of service connections (water, sewer, power, fibre)
  • Check council zoning and building envelope (setbacks, height limits, coverage)
  • Review any covenants imposed by the developer
  • Get indicative building costs from builders
  • Confirm resource consent requirements for your intended build
  • Check for any contamination (especially former farmland or industrial sites)
  • Standard checks: LIM report, title review

Frequently Asked Questions

Can I get a mortgage for bare land?

Yes, but banks typically require a larger deposit (30-50%) and may charge higher interest rates. Some banks will offer a construction loan that covers both the land purchase and building costs.

How long can I hold bare land before building?

There's generally no time limit, but some covenants in new subdivisions require building within 1-2 years. Check the title for any such conditions. You'll also be paying rates and interest on unimproved land.

Buying This Type of Property in New Zealand?

Upload your documents and Shire will flag the risks specific to your purchase.

No commitment required · Start free